Did you know… three of the largest geothermal power plants in the world are found in Indonesia?...

Located in Las Tablas, Madrid, Spain, the headquarters of Banco Bilbao Vizcaya Argentaria, S.A.(BBVA), La Vela “The Sail”, is 93 m (~305 ft) high and has 19 floors. It resides in a 114,000 m2 (~1,227,086 ft2) office and service building complex, which includes seven more three-floor buildings. It is also heated and cooled using geothermal energy.
The headquarters were built with the sustainability criteria necessary to be deemed LEED gold certified, which is the strictest sustainable construction standard. La Vela and the other buildings were built using low environmental impact materials and have remote energy consumption monitoring technologies.
There are multiple renewable energy systems being used throughout the complex. Along with solar and water collection/recycling systems, the buildings have also installed closed-loop geothermal systems. The installation of these systems curbs the complex’s energy consumption by 8.3% and carbon emissions by 7.6%.
https://www.bbva.com/en/la-vela-bbvas-new-architectural-landmark-in-madrid/
Keep up to date on what is going on at Utah FORGE. Read about it in the quarterly newsletter. SUBSCRIBE and receive updates and special announcements. Open and download a pdf version UtahFORGE-Athe CoreNewsletter-vol1-042020
Did you know that Utah is No.3* in the United States for its production of geothermal energy? The State of Utah is responsible for 2.8 % of the national geothermal power production. The United...
The Utah FORGE project made a number of important advances in 2019 in preparation for the start of deep drilling in 2020. Instrumentation for seismic monitoring was enhanced with the drilling of two new vertical holes, 68-32 (1000’ deep) and 78-32 (3200’ depth), which...