No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
In March, 2019, the two new vertical wells for monitoring were completed. The shallow well (68-32) was drilled to 970 ft depth, penetrating alluvial sands and gravel. The deeper well (78-32) was drilled to about 3300 ft depth, having intersected the contact with...
Winning teams have been announced in the 2019 Geothermal Design Challengeâ„¢ Data Visualization contest. The U.S. Department of Energy (DOE) Geothermal Technologies Office (GTO), in partnership with the Frontier Observatory for Research in Geothermal Energy (FORGE) and...
Winter is at its tail end and the phase 2C activities are kicking off.